Eclipse Global Facebook Icon
 

IN THE SCOPE OF THE CUSTOMER

 
Buleets

Complete wiring of three core cable (each wire 2.5mm² cross section area) with outer sheath insulation in the scope of client and to be routed so as to have a accessible point near each window for the operation of the blinds. Each blind supplied by us is normally of 2.5mtrs cable and a switch/es for the operation of the blinds.

Buleets

Central power source for each floor to be provided by customer: this source must be capable for operating x nos of blinds simultaneously (detailed specifications will be submitted after the receipt of the order).The input supply should be regulated AC supply within the range 230-220V AC input voltage to the motor is 24-18V DC.

Buleets

The size of the window opening as agreed upon during the finalisation has to be diagonally perfect, square at corners in the window sections to avoid any stresses on the glass as well as the fitments. Any major imperfections in the plaster/surface shall be attended/rectified by the client.

Buleets
Wherever the scaffolding is required at a non-approachable height, it shall be charged extra at actuals or has to be provided by the customer.
Buleets
Unloading of the DGU has to be managed by the customer on-site.
 

Technical Specifications

   
   
Site By : Tiger Advertising